Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Home ProductsDiesel Forklift Truck

3 Stage Mast Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift

China Sino Construction Equipment Co., Ltd certification
China Sino Construction Equipment Co., Ltd certification
I have cooperated with this company for more than 5 years. We have good relationship. During each cooperation, they give me perfect quality machinery and worry-free after sale service. They always treat me as their friend and family. I have good purchase experience with them.

—— Mr.Stephen

I'm from Angola. I purchased both trucks and wheel loader from this company. Their products are very good. And give me intimate after-sales service. The cooperation with this company is very smooth and mutual-benefit. We have kept long-term cooperation and I believe it will last longer.

—— Mr.Eation

I'm Online Chat Now

3 Stage Mast Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift

3 Stage Mast Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift
3 Stage Mast Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift 3 Stage Mast Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift 3 Stage Mast Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift

Large Image :  3 Stage Mast Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift

Product Details:

Place of Origin: China
Brand Name: Lonking
Certification: ISO
Model Number: LG120DT

Payment & Shipping Terms:

Minimum Order Quantity: One set
Price: Negotiable
Packaging Details: In nude
Delivery Time: 30-35 work days
Payment Terms: L/C, T/T
Supply Ability: 300 Unit/Units per Month
Detailed Product Description
Condition: New Overall Dimensions: 4209*1480*2250 Mm
Fork Length: 1070 Mm Max. Lifting Height: 5 M
Power Souce: Diesel Engine Min. Lifting Height: 0.15 M
High Light:

diesel operated forklift

,

electric reach truck forklift

3 Stage Mast Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift

 

Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift Max. Lifting Height: 5 m

1, Engine : International brand Cummins CUMMINS QSB4.5-C160
2, Door frame :The door frame channel steel thickening and more reliable performance.


3, Drive axle: Drive axle is enhanced model,more strength. guarantee the reliability of the use,long service life.

 

4, Tyre:Front tyre choose 10.00-20 products, stronger bearing capacity, each tire can bear 400 kg more.
5 , Steering bridge: Steering bridge use H2000 type product, high strength work more stable performance.

 

6. The radiator: The radiator of the material is copper ,Other brand of materials are generally use aluminum, copper is better than aluminum heat dissipation effect .

 

7. Appearance design is similar to Linde, more streamlined, stick to world trend.

 

The main technical parameter of Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift

Item Specification Unit  
General 1 Model   LG120DT
3 Power Type/model   Diesel
4 Rated Capacity Kg 12000
5 Load Center mm 600
Dimensions 6 Lift Height mm 3000
7 Fork Size(LxWxT) mm 1600×175×90
8 Fork Spread(outside)(Min./Max) mm 450/1960
9 Mast Tilt Angle(F/R) deg 6·/12·
10 Fork Overhang mm 750
11 Overall Dimensions Length without forks mm 4460
12 Overall Width mm 2180
13 Mast Lowered Height mm 2710
14 Overhead Guard Height mm 2580
15 Outer turning Radius   mm 4450
Performance 16 Speed(Unload/Load) Travel km/h 24/20
17 Lifting mm/s 300
18 Max.gradeability(Load) % 20
19 Max.drawbar pull(Load) KN 100
20 service Weight kg 13500
Wheels&Tires 21 Tire Front   4×11.00-20-16PR
22 Rear   2×10.00-20-16PR
23 Tread Front mm 1600
24 Rear mm 1770
25 Wheelbase mm 2950
26 Ground Clearance(Under mast) mm 260
Power & Transmission 27 Battery Voltage/Capacity(5HR) VA/h 2×12/90
28 Engine Model   CUMMINS QSB4.5-C160
29 Manufacture   cunmmins
30 Rated Output Kw 92
31 Rated Torque N.m 460
32 No.Of Cyinder   6
33 Bore*stroke mm 108/125
34 Displacement L 6.871
35 Transmissions Manufacture   Lonking
36 Type   Fluid TorqueConverter
37 StageFWD/RVS    
  38 Operating Pressute Mpa 19

 

The pictures of the Lonking 10 ton forklift LG120DT

3 Stage Mast Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift 03 Stage Mast Diesel Forklift Truck LG120DT Lonking 12 Ton Pallet Forklift 1

All photos and data are accurately and timely provided.


 

Contact us

 

If you have interest in any of machines ,welcome to Shanghai China and visit our company ,we would like to show you around our yards and our city, tell you some detailed introductions about our products , We will do our best to make you satisfaction , you just think it is a tour for fun and make your visit like homing..

 

Packaging & Shipping

 

1. Wax:

Do swax protective measures to against the trailer body suffer seawater corrosion during shipping.

2. Tarpaulin

It can effectively prevent the goods in the sun and rain during transport

 

 

FAQ

Q: Are you Dealer or Factory ?

A: We are the subsidiary factory of Sinotruk and adopt the strict quality control system which the high quality of the truck.

 

Q : What is your advantages ?

A : We are the subsidiary factory of Sinotruk and we adopt the strict quality control system during the production which makes the high quality truck.

B: We are directly factory we can meet all the requirements form customers and provide a better technical support to customers.

 

Q : I want to transport the truck by container, is it ok?

A: Yes, it is ok .But we need take apart the truck .You should reinstall in your country.

 

Q : How about your product quality ?

A: All our spare parts are from the original manufacturers, the quality is 100% guaranteed.

 

Q : I want to be your agent in my country , is that ok?

A : It’s ok, If your quantity is big, we will consider. For the first time 50 units is ok.

 

 

Q. How about your company's service, especially after-sale service ?

A: SINOTRUK has been in this field for nearly 60 years and has strong production and distribution capability, we can satisfy your demand within 3-7 days. We always do our best to solve all the problems and put our customer's interests in the first place.

 

Q : What is your payment terms?

A : You can choose to the 30% prepaid and 70% paid before delivery or you can choose the LC 100% at sight.

 

Q : What is your lead time ?

A : Usually it is 30-50 days after deposit received.

 

Contact Details
Sino Construction Equipment Co., Ltd

Contact Person: Bonnie Cui

Send your inquiry directly to us (0 / 3000)